USEPA Superfund Site Hazardous Waste Landfill
                    Southern Ohio
                    GEO has performed the installation of numerous soil borings, groundwater monitoring and groundwater recovery wells at this site. All work as been completed in conformance with the remedial design/remedial action plan implemented at this site.
                    Multiple drilling techniques have been used at this site to complete the work including hollow stem augers, cable tool drilling (drive up to 16 inch diameter casing to 85 feet deep) and hand sampling using an Acker hand sampling system. The wells installed have been of various sizes including 2 feet, 4 feet and 6 feet and have been constructed of both PVC and stainless steel. All wells were developed by pumping and surging.
                    Also, 72 hour pump testing was performed in 6 inch stainless steel wells. Very strict decontamination procedures were followed and some work as completed at Level C.